73 viviendas en
El Cañaveral, Madrid

4,000 m² of lightweight industrial curtain wall facade clad with 8 mm fiber cement panels.

Architect

CIP Arquitectos

Developer

Aedas Homes

Builder

CHM Obras e infraestructuras

Location

El Cañaveral, Madrid

Construction period

2023

Area

4.000 m2
Scroll to the top